Z013 - Doha Oasis Link Roads - Site Instructions No. 03
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
GEC Contracting Services & Trading | Road Works | 14,186,022.2 | On-going |
Construction of CP07-C-1B Commercial Boulevard with Road D3, Road A4, Internal Roads, Utilities and Underground Car Parks 2, 3, 4 and 5
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
WCT-Al Ali Joint Venture | Supply, Delivery and Application of Road Marking Works to Internal Roads, Road A3, Road A4, Road D3 and J-11 QP-2 Highways | 581,445.2 | On-going |
(CE-5135) Roads and Infrastructure in Jeryan Nejaima (Block 1700) DN101)
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Lay Sub-Base | 527,652.22 | On-going |
Construction of New Interchange IC3 Ras Bu Fontas Free Zone
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Redco PORR IC3 JV | Road Works | 94,185.00 | On-going |
Removal of Existing Road Marking
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Trading and Agency Services Limited Company W.L.L. (Trags) | Removal of Existing Road Marking | 5,000.00 | On-going |
D-Ring Road - Improvement Works
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
UCC Infraroad Limak JV Co. W.L.L. | Supply and Laying of Asphalt Base and Wearing Course Works | 1,400,000.00 | On-going |
Construction of Duhail Intersection and Gharrafa Street (P007 C7 P1) (Al Waab Street Interim Improvement Works - EDS1511)
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
UCC Infraroad Limak JV Co. W.L.L. | Supply and Laying of Asphalt Base and Wearing Course Works | 9,836,106.21 | On-going |
Refurbishment, Reinstatement and Repair Works for Strategic Locations in Qatar - Phase 2 (Qatar North), ZF_027
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The Works consists of the repair, replacement, and rehabilitation and/or upgrading of locations in Qatar, North. | 32,642,701.17 | On-going |
(CE-5132) Design and Build Contract for FIFA Readiness Project 6 for Madinat Khalifa & Immigration Underpass Scheme C851/6 Project
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Road Diversion, Road Works and Road Markings Package | 13,017,843.00 | On-going |
Roundabout Implementation in Al Zubara Junction 6
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Trading and Agency Services Limited Company W.L.L. (Trags) | Asphalt Works | 2,469,183.04 | On-going |
(CE-5134) DW044-P03 Roads and Infrastructure in Al Mearad and Southwest of Muaither - Package 3 Project
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Road Diversion, Road Works and Road Markings Package | 16,380,710.78 | On-going |
Zonal Framework Contract for Road Maintenance Qatar - Vehicle Infrastructure Integration for V2X Technology Implementation - Provision for Road Markings Throughout Qatar, Contract 1, ZF-084
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The Works shall carryout the inspection at specified location as per Engineer instructions and submit reports defining condition of marking condition. Investigate and suggest locations where requires improvement, reporting for further action in order to keep all safety devices of area updated throughout the contract period. | 3,643,038.60 | On-going |
Central Doha & Corniche Beautification - Package 2A
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
AlJaber Engineering Company W.L.L. | Road Works | 3,106,500.00 | On-going |
Roads and Infrastructure in Semaisma - Package 4
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
AlJaber Engineering Company W.L.L. | Road Works | 11,372,884.50 | On-going |
Remote Transfer Baggage Facility - Building Package No. HIAEP - 0014
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
AlJaber Engineering Company W.L.L. | Supply, Delivery , Laying, Compaction, Installation and Testing of Road Works, Road Marking and Milling Works | 7,661,108.65 | On-going |
(CE-5126) Sewer Repair, Replacement and Rehabilitation Framework – SR_104 – Operation, Maintenance and Rehabilitation Programme Unplanned Works – PS25-5 & 25-6 Gravity Mains Rehabilitation
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Supply and Apply of Reinstatement Works | 186,300.00 | On-going |
(CE-5127) Sewer Repair, Replacement and Rehabilitation Framework – SR_105 – Operation, Maintenance and Rehabilitation Programme Unplanned Works – Al Maamoura, Nuaija and Hilal Gravity Mains
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Supply and Apply of Reinstatement Works | 587,200.00 | On-going |
(CE-5128) FS-Network Refurbishment For Doha West -PS 34-Gravity Mains
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Supply and Apply of Reinstatement Works | 587,200.00 | On-going |
Recycle Plant Development and Operation in the Ashghal/PWA Logistics Area for Qatar Primary Materials Co.
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Qatar Primary Materials Company (QPMC) | Crushing and Screening Operation for Production of Primary Construction Materials in Asghal Logistics Areas for Qatar Primary Materials Company | – | On-going |
Central Doha & Corniche Beatification Project - Package 2 (Work Order No. 1)
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The Central Doha & Corniche Beautification Project covers downtown Doha from Al Corniche Road to C-Ring Road. The project covers the institutional, government and prestige developments between Al Corniche Road and A-Ring Road, and the commercial, residential and business developments between A-Ring Road and C-Ring Road. The Package-2 scope includes infrastructure and beautification for three (3) internal zones and three (3) main corridors (roads) sections as; Zones 17 East, Zone 18 East, Zone 18 West, Museum Park Street, Ali Bin Amur Al Attiya Street & Museum Street. | 342,411,764.80 | On-going |
(CE-5135) Roads and Infrastructure in Jeryan Nejaima (Block 1700) DN101)
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Road Diversion, Road Works and Road Markings Package | 29,733,326.33 | On-going |
(CE-5137) DWN073-P01 Roads and Infrastructure in Duhail South and Umm Lekhba (Zone 30 & 31) Package 01
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Road Diversion, Road Works and Road Markings Package | 21,700,652.06 | On-going |
(CE-5136) Roads and Infrastructure in South of Al Meshaf - Package 07
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Road Diversion, Road Works and Road Markings Package | 31,281,167.63 | On-going |
Design and Construction of Correctional Facilities and Female Forces
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
AlJaber Engineering Company W.L.L. | Asphalt Road Works | 2,017,413.72 | On-going |
Design and Construction of Traning Village
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
AlJaber Engineering Company W.L.L. | Road Works and Road Markings | 3,272,651.30 | On-going |
RIW for Junctions and Roundabouts in various Areas of Greater Doha Phase-9
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The project works located in various parts of Greater Doha and Qatar, covering Qatar Zones 1 to 98 of various Municipalities. The Works comprises the conversion of various existing roundabouts/junctions into signalized junctions, including protection of existing utilities, inspection of existing traffic signals equipment, liaison with the Utility Departments/Authorities, replacement of old traffic signals equipment, provision, installation, testing, commissioning and maintenance of traffic signal equipment. All Works are to be executed through Work Order instructions. | 216,948,359.62 | On-going |
New Port Project Strategic Food Security Facilities - Contract No. NPP0085
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
AlJaber Engineering Company W.L.L. | Asphalt Paving Works | 18,011,164.42 | On-going |
CP08-1-A: Infrastructure & Landscaping at Spine and Marina Roads/ CP08-2-A: Infrastructure & Landscaping Works for Villas in Qetaifan Islands South
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Midmac Contracting Co. W.L.L. | Supply and Application of Road Markings | 385,221.95 | On-going |
Main Works for the Fifth Precinct Stadium (Al Thumama Stadium)
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
AlJaber Engineering L.L.C & Tekfen Construction and Installation Co. Inc. JV | Supply, Installation, Supervison, Testing & Commissioning of Asphalt Works and Road Marking Works | 12,727,257.30 | On-going |
Framework Agreement for Call-Off Contracts for Landscaping, Irrigation and Ancilliary Works
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | Framework Contract for hard and soft landscaping, irrigation and ancillary works including cycle paths for a period of 1095 days. The Works will include work to a number of sites which will be selected by the Engineer located with Greater Doha parameter. | 200,000,000.00 | On-going |
Interim Improvement of B-Ring Road, Al Mannai and Guest Palace Roundabout Scheme
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The Works involves the reconstruction and upgrade of roads which comprise 3.58km along B-Ring Road. The proposed interim improvements include converting the current Gulf (Mannai) roundabaout to a signalized junction by introducing structural works. Refurbishment of th eexisting Al Mannai (Gulf) underpass storm water drainage system. Installation of new utilities and diversion and protection of existing utilities. Relocation and shifting of substation. | 471,845,344.02 | On-going |
RIW for Junctions & Roundabouts in Various Areas of Greater Doha, Phase - 7
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The works comprises the conversion of various existing roundabouts/junctions into signalized junctions, include the protection of existing utilities, inspection of existing traffic signals equipment, liaison with the Utility Department/Authorities, replacement of old traffic signals equipment, provision, installation, testing, commisioning and maintenance of traffic signal equipment. All works are to be executed through work order instruction. | 135,740,605.90 | On-going |
Qatar E-Ring Road - North/South Link (P008-C2) Road marking For Permanent Works
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Daewoo E & C | Road Marking for Permanent Works | 5,225,552.45 | On-going |
Zonal Framework Contract for Road Maintenance Qatar - Zonal Inspections for Qatar North West ZF_006
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The Works consist of inspections, repair, replacement, rehabilitation, upgrading and/or planned regular routine and reactive maintenance, which includes surveys, cleaning and reporting on any Authority’s roads network assets in the State of Qatar. | 39,774.817.92 | On-going |
Zonal Framework Contract for Road Maintenance Qatar -Zonal Inspections for Qatar South West ZF_001
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Public Works Authority | The Works consist of inspections, repair, replacement, rehabilitation, upgrading and/or planned regular routine and reactive maintenance, which includes surveys, cleaning and reporting on any Authority’s roads network assets in the State of Qatar. | 31,161,641.42 | On-going |
(C_5133) Roads and Infrastructure in North of Ain Khalid (Zone 56) - Package 01
Client | Project Description | Project Value (QAR) | Status |
---|---|---|---|
Petroserv Limited | Road Diversion, Road Works and Road Markings Package | 5,041,353.29 | On-going |
Construction of New Interchange IC3 Ras Bu Fontas Free Zone
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Redco PORR IC3 JV | Road Works | 402,550.50 | 03-Jan-2021 | Completed |
Al Muntazah Street Package #13
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber & Partners W.L.L. | Road Marking Works | 185,045.00 | 24-Dec-2020 | Completed |
Zonal Framework Contract for Road Maintenance Qatar -Rehabilitation Works for Hazm Al Markhiya, ZF_018
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The Works consist of inspections, repair, replacement, rehabilitation, upgrading and/or planned regular routine and reactive maintenance, which includes surveys, cleaning and reporting on any Authority’s roads network assets in the State of Qatar. | 23,129,527.76 | 23-Aug-2020 | Completed |
Construction of Duhail Intersection and Al Gharraf a Street (P007 C7P1)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Urbacon Trading and Contracting / Infraroad / Limak | Road and Paving Works | 2,873,000.00 | 10-Aug-2020 | Completed |
Al Rayyan Stadium SC2022 Support Works - Package 06
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
AlJaber Engineering Company W.L.L. | Road Works for Running Track | 194,500.00 | 22-Jun-2020 | Completed |
Qatar Early Warning Radar Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Man Enterprise Qatar (Raytheon) | Supply and Apply of Road Markings | 30,586.00 | 14-May-2020 | Completed |
QEZ3 - Um Al Houl Free Zone
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Cougar Contracting | Road Works | 1,338,970.60 | 08-Apr-2020 | Completed |
Provision of Road Markings Throughout Qatar, Contract 6
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Design, Supply and Installation of road markers in the road network. | 8,380,000.00 | 02-Mar-2020 | Completed |
Construction of Bus and Cars Parking Area for Rail (Package 4)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The proposed Bus Station and Park & Ride facility is located in Lusail. Scopes of Works are as follows:
| 31,814,536.00 | 25-Feb-2020 | Completed |
Enabling Works for Construction of 3 Corniche Pedestrian Underpasses
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The project includes Construction of the Temporary Traffic Management (TTM) Phase-1, Design (as it relates to traffic management, shoring ssystem ad provision of dewatering system) and Construction of the Enabling Works for the following three (3) pedestrian underpass:
| 97,474,571.54 | 30-Nov-2019 | Completed |
ARM Division for East Corridor Project P011 (Package-2) - China Harbour
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Darwish Engineering | Road Marking Removal Works | 372,000.00 | 30-Nov-2019 | Completed |
CP 7B - Lusail Plaza - Infrastructure Works, LRT Station, Public Car Park & Landscape
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
QD-SBG Construction | Supply, Delivery, Installation, Testing and Handing Over of Compliant Thermoplastic Road Marking | 550,107.10 | 24-Nov-2019 | Completed |
Construction of Bus and Cars Parking Area for Rail (Package 1)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The scope of works includes Asphalt parking area for approximately 300 vehicles with specialized canopy shading, fully paved carriageways, including providion for pedestrians and cyclist access, specialist lighting, signage and wayfinding, security building a guardhouses with the necessary service connections, all access control requirements; including all security infrastructure and equipment, all fit out requirements including all hardware but exclusive to any specialist software, utilities and infrastructure. | 48,129,144.87 | 12-Nov-2019 | Completed |
Qatar Early Warning Radar Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Man Enterprise Qatar (Raytheon) | Asphalt Works | 1,988,180.00 | 30-Oct-2019 | Completed |
Lusail CP3A2 Bridge 8 Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Samsung C&T Corporation | Pavement Rectification at Bridge No. 8 | 60,000.00 | 10-Oct-2019 | Completed |
Construction of Sports Marina and Container Park
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading and Contracting Co, W.L.L. | Asphalt Repair Works | 15,000.00 | 09-Sep-2019 | Completed |
Construction of the Parade Shaded Stage Building (Zone 27/Building 27B) and Associated Works
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
AlJaber Engineering Company W.L.L. | Road Works and Road Marking Works | 1,376,901.20 | 15-Aug-2019 | Completed |
Dukhan Road Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
QD-SBG Construction | Road Marking Works | 4,290,884.00 | 01-Aug-2019 | Completed |
Zonal Framework Contract for Road Maintenance Qatar - Rehabilitation Works for Al Khor 2, ZF_011
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The Works consist of inspections, repair, replacement, rehabilitation, upgrading and/or planned regular routine and reactive maintenance, which includes surveys, cleaning and reporting on any Authority’s roads network assets in the State of Qatar. | 41,385,968.50 | 11-Jul-2019 | Completed |
Zonal Framework Contract for Road Maintenance Qatar - Rehabilitation Works for Al Khor 1, ZF_010
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The Works consist of inspections, repair, replacement, rehabilitation, upgrading and/or planned regular routine and reactive maintenance, which includes surveys, cleaning and reporting on any Authority’s roads network assets in the State of Qatar. | 49,994,498.34 | 11-Jul-2019 | Completed |
Wakra Stadium
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Unigulf Electro Mechanical Services Co. | Road Marking Works | 460,657.00 | 31-May-2019 | Completed |
Rehabilitation and Maintenance of Roads Throughout Qatar, Contract 2/2015
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Works generally comprise of reconstruction, rehabilitation of maintenance of roads involving the General Traffic Works for Internal and External Works to ensure the safe movement of both vehicular and pedestrian traffic on all roads throughout the State of Qatar. | 65,633,044.81 | 15-May-2019 | Completed |
Rehabilitation and Maintenance of Roads Throughout Qatar, Contract 1/2015
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Works generally comprise of reconstruction, rehabilitation of maintenance of roads involving the General Traffic Works for Internal and External Works to ensure the safe movement of both vehicular and pedestrian traffic on all roads throughout the State of Qatar. | 56,220,575.00 | 13-May-2019 | Completed |
Construction of Extension Road to Simaisma
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
AlJaber Engineering Company W.L.L. | Supply and Apply of Road Markings | 64,909.46 | 10-May-2019 | Completed |
Al Wakrah Bypass Road (P015)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Larsen & Toubro Limited | Road Marking Works | 36,400.00 | 09-May-2019 | Completed |
Al Rayyan Stadium SC2022 Support Works - Package 06
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphalt Road Works and Road Marking Works | 15,578,764.30 | 30-Apr-2019 | Completed |
Al Jaber Farm
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Group | Road Works | 2,485,408.92 | 13-Apr-2019 | Completed |
Road Improvement in Al Furousiya Street
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Upgarding of the Al Furousiya Street to 4 lanes including the following Components:
| 253,964,985.46 | 07-Apr-2019 | Completed |
Access Roads to Al Wakra Central Market
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Involves the fast track construction including the construction of cast in situ reinforced concrete through approaches to both ends of an existing tunnel underpass. | 226,121,308.63 | 07-Apr-2019 | Completed |
Construction and Upgrade of Rayyan Road Project 7 Contract 2; West of Olympic R/A to West of Rayyan R/A
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Dogus – Onur JV | Temporary and Permanent Road Marking Works | 2,244,654.75 | 31-Mar-2019 | Completed |
Doha Port Redevelopment Project - Infrastructure and Streetscape Works
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Petroserv Limited | Asphalt Works | 11,848,265.97 | 13-Feb-2019 | Completed |
Design and Built of Port Visitor Center (NPP0065)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading and Contracting Co, W.L.L. | Supply and Application of Asphalt Works | 592,584.25 | 31-Jan-2019 | Completed |
Construction & Upgrading of E-Ring Road (P008-C2)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Daewoo E & C | Supply and Laying of PMB Wearing Course at F-Ring Road | 912,000.00 | 23-Sep-2018 | Completed |
Construction & Upgrading of E-Ring Road (P008-C2)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Daewoo E & C | Supply and Laying of PMB Wearing Course (Reworks) | 684,000.00 | 23-Sep-2018 | Completed |
Construction of Roads and Infrastructure at Um Al Houl Economic Zone (QEZ-3) (Packages 3.1.A & 3.1.B)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Leighton Contracting Qatar W.L.L. | Asphalt Works | 2,305,356.00 | 30-Aug-2018 | Completed |
Development of Al Maadeed Street & Surrounding Roads
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The project works located in Doha area within the vicinity Zone 56 of Doha Municipality between Haloul Street and Wholesale Market Street. The works comprise development of Al Maadeed Street & Al Erbayyat Street approx. 5.0km two lane dual carriageway including 4 nos. Signalized Junctions and 1.5km service road and parking bay. | 113,885,093.90 | 22-Aug-2018 | Completed |
Roads and Infrastructure in Al Kheesa North and East (Rawdat Al Hamama District), Package 1
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Combined Group Co – SACYR JV | Road Marking Works | 576,647.69 | 30-Jul-2018 | Completed |
Road Marking Works at P023 Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
JAK Construction | Road Marking Works | 24,610.50 | 02-Jul-2018 | Completed |
Construction & Upgrading of E-Ring Road (P008-C2)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Daewoo E & C | Road Marking Works at F Ring Road | 145,977.50 | 30-Jun-2018 | Completed |
P-6B Waterfront / Kharaej Tower
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber & Partners | Road marking for Junction Box – Type 525 – Yellow – Hot Applied – Thermoplastic | 13,860.00 | 30-Jun-2018 | Completed |
Falcon - 3 Facilities and Infrastructure at Al Udeid Air Base, Qatar
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
United Construction Est. | Removal of Paint at Apron Area | 33,750.00 | 24-Jun-2018 | Completed |
Lusail Development Primary Infrastructure CP3A - Phase 2
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Samsung C&T Corporation | Pavement Works | 1,650,877.00 | 19-May-2018 | Completed |
Construction & Upgrading of E-Ring Road (P008-C2)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Daewoo E & C | Milling Works at F Ring Road | 400,000.00 | 14-May-2018 | Completed |
Road Safety Improvement Program Stage 2A
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Boom Construction Company | Supply and Apply of 4 Coat Street Bond SP150 | 217,000.00 | 30-Apr-2018 | Completed |
Roads and Infrastructure in Rawdat Abal Heeran (MMUP Ph2, Package 8) DW015 - Package 2
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Consolidated Contractors Group (CCC) & Teyseer Contracting Company – JV | Supply and Apply of Traffic Marking to Pavement | 599,529.00 | 08-Mar-2018 | Completed |
Supply and Laying of Asphalt in Al Luqta Area
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Consolidated Contractors Company | Supply and Laying of Asphalt Wearing Course 50mm thick, 60/70 | 472,803.66 | 07-Mar-2018 | Completed |
Construction & Upgrading of E-Ring Road (P008-C2)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Daewoo E & C | Production, Supply, Delivery, Laying, and Compaction of Asphlatic Concrete Materials for temporary Traffic Diversion at Junction 3 | 9,131,644.80 | 31-Jan-2018 | Completed |
Bani HajjerNorth Phases 1 & 12
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Combined Group Co. – Sacyr JV | Road Marking Works | 607,295.00 | 30-Jan-2018 | Completed |
Baladna Dairy Farm - Phase 1
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Urbacon Trading and Contracting | Supply and laying of Asphalt for Parking Area in Baladna Phase 1 | 230,194.36 | 31-Dec-2017 | Completed |
Design & Build Infrastructure, Roads and Landscaping for QEZ-1 (Economic Zone)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Sacyr-UCC JV | Construction of Temporary Access Road | 2,176,691.00 | 31-Dec-2017 | Completed |
Construction & Upgrading of E-Ring Road (P008-C2)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Daewoo E & C | Production, Supply, Delivery, Laying, and Compaction of Asphlatic Concrete Materials for Doha Corniche Project | 330,000.00 | 23-Dec-2017 | Completed |
Flood Prevention Scheme - Hot Spot Projects
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Petroserv Limited | Asphalt Road Reinstatement Works for Work Orders SR_HS_002, SR_HS_003, SR_HS_005, SR_HS_006, SR_HS_007, SR_HS_010 ANDSR_HS_016 | 17,410,000.00 | 30-Nov-2017 | Completed |
Infrastructure Works at Wadi Crossing Between Seef Lusail South & OEC
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Urbacon Trading and Contracting | Asphalt Works | 1,320,975.20 | 22-Oct-2017 | Completed |
Road Improvement Works for Junctions & R/A in Various Area of Greater Doha Phase-6
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Buzwair Engineering & Contracting | Supply and Laying of Asphalt Wearing Course | 5,760,000.00 | 30-Sep-2017 | Completed |
Road Marking Removal Works at Aziziya, Al Corniche, Al Waab, Al Sudan, Ras Abu and Jooan Site
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Joyston and Jyline Infrastructure Co. W.L.L. | Road Marking Removal Works | 105,703.50 | 21-Sep-2017 | Completed |
Lusail Development Primary Infrastructure CP3A - Phase 2
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Samsung C&T Corporation | Pavement Works and Road Marking | 1,883,988.99 | 31-Aug-2017 | Completed |
Road Improvement Works for Junctions & R/A in Various Area of Greater Doha Phase-6 Site Instruction No. 2 (Mamoura)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Buzwair Engineering & Contracting | Asphalt Road Works | 1,991,000.00 | 30-Aug-2017 | Completed |
Al Wajba Residential Compounds
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
AG Middle East | Subgrade (Levelling Only), Sub-base Class B (Supply and Laying), Complete Asphalt Works, Kerb Installation and Road Marking Works | 7,752,213.00 | 15-Jun-2017 | Completed |
Road Improvement Works in Northern Areas
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Tawfeeq & Partners Contracting W.L.L. | Asphalt Works, Road Paving | 16,000,000.00 | 31-May-2017 | Completed |
Design and Construct of New Orbital Highway and Truck Route (P023) Contract 3: Oribital Highway: Mesaieed to Salwa Road
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Leighton Contracting Qatar W.L.L. – Al Jaber Engineering LLC JV | Design, supply, Installation and Commissioning of Two (2) Asphalt Batching Plant. Supply and Lay of Asphalt. Supply and Application of Prime Coat and Tack Coat. Road Works for Temporary Traffic and Road Marking Works. | 1,127,002,431.90 | 10-Apr-2017 | Completed |
Construction of EPIC for Automation Upgrade of Jaleha Degassing Station
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tadmur Contracting W.L.L. | Supply, Lay, Handing Over, Maintain and Remedy of Asphalt Works | 302,679.00 | 03-Apr-2017 | Completed |
Construction and Upgrade of Rayyan Road Project 7 Contract 2; Temporary Traffic Diversion and Permanent Asphalt Works
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Dogus – Onur JV | Temporary Traffic Diversion and Permanent Asphalt Works | 25,634,650.00 | 22-Feb-2017 | Completed |
Provision of Road Markings Throughout Qatar, Contract 4
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Design, Supply and Installation of road markers in the road network. | 7,173,320.00 | 13-Jan-2017 | Completed |
Provision and Painting of Speed Humps Throughout Qatar, Contract 4
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Design, supply and apply of speed hump, speed table, speed reducers, speed breaker markings and installation of traffic signs related to humps in the road network. | 4,323,150.00 | 13-Jan-2017 | Completed |
Provision and Painting of Speed Humps Throughout Qatar, Contract 1
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Design, supply and apply of speed hump, speed table, speed reducers, speed breaker markings and installation of traffic signs related to humps in the road network. | 4,323,150.00 | 13-Jan-2017 | Completed |
Maintenance and Improvements of Roads Throughout Qatar, Contract 1
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The Works are to be carried out on Major and Minor Roads at various locations throughout the State of Qatar. The works generally comprise of reconstruction, rehabilitation and maintenance of general nature to ensure safe movement of Vehicular and Pedestrian Traffic on all roads throughtout the State of Qatar | 57,834,247.00 | 23-Nov-2016 | Completed |
Construction of Car Parking in Various Areas of Greater Doha
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Project Works located in various part of Doha areas within the boundary of Qatar Zones 1 to 68 of Doha Municipality. Works comprise the construction of temporary / permanent car parking, provision of utility services including surface water drainage and street lighting works. | 34,825,449.00 | 17-Nov-2016 | Completed |
CP-13 of NPP0057 (New Port Project)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Sinohydro Group Ltd. | Road Works | 32,774,273.00 | 06-Oct-2016 | Completed |
Access Road at Umm Birkah (C110/022)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tadmur Contracting W.L.L. | Road Marking Works | 97,028.97 | 13-Aug-2016 | Completed |
Provision of Road Markings Throughout Qatar, Contract 3
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Design, Supply and Installation of road markers in the road network. | 7,173,320.00 | 07-Jul-2016 | Completed |
Provision of Road Markings Throughout Qatar, Contract 3 & 4
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The Works shall be carried out in various location of the State of Qatar based on the details prescribed in series of Work Order. The Works shallconsist Supply and Installation of road markers in the road network. | 6,592,750.00 | 23-May-2016 | Completed |
Asphalt Works for Road Diversion and Minor Works Pipeline for Mega Reservoir Corridor
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphlat Works | 475,848.00 | 29-Feb-2016 | Completed |
Safety Improvement Programme - Stage 1
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The works are to be carried out on Major and Minor Roads throughout the State of Qatar Area. The Works shall consist of the road safety improvement measures to ensure the safe movement of vehicular and pedestrian traffic on all roads throughout the State of Qatar. | 59,819,570.00 | 05-Jan-2016 | Completed |
Construction of CP07-A-1B Waterfront Commercial / Seef Lusail Infrastructure Works - North
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Supply and Laying of Sub-base Material | 630,000.00 | 15-Nov-2015 | Completed |
Roads and Infrastructure in Wadi Aba Seleel (Package 1A) - Advance Grading and Temporary Roads
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Advance Grading and Temporary Roads, Asphalt base Course and Prime Coat | 28,064,164.72 | 15-Nov-2015 | Completed |
Construction of CP07-A-1B Waterfront Commercial / Seef Lusail Infrastructure Works - North
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphlat Road Works and Road Markings | 5,268,409.00 | 15-Nov-2015 | Completed |
RIW for Junction & Roundabouts in Various Area of Greater Doha, Zone 1 to 68 Phase 5
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The project works located in various part of Doha areas within the boundary of Qatar Zones 1 to 68 of Doha Municipality. The works comprise of conversion of various existing roundabouts/junctions into signalized junctions, include the inspection of existing traffic signals equipment, liaison within the Utility Departments/Authorities, replacement of old traffic signals equipment, provision, installation, testing, commissioning and maintenance of traffic signal equipment. | 108,996,749.00 | 15-Nov-2015 | Completed |
Qatar University Student Housing Project Phase 2 of Part 1, Doha
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Societe D’ Enterprise et de Gestion SEG – Qatar W.L.L. | Road Works at Qatar University | 11,348,160.00 | 15-Sep-2015 | Completed |
North Farm (Umm Al Hawaya Farm) (U-238-238-13-NF)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Urbacon Trading and Contracting | Road Working Works including Base Course, Sub-base and Wearing Course | 2,250,000.00 | 01-May-2015 | Completed |
Upgrading of Mesaieed Town RPS
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Aspahlt and Road Marking Works | 956,425.00 | 27-Apr-2015 | Completed |
Reconstruction and Strengthening of Damaged Asphalt Roads in Qatar Steel Plant
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Qatar Steel Company | Reconstruction and Strenghtening of Damaged Aspahalt Roads in Qatar Steel Plant | 3,300,000.00 | 16-Mar-2015 | Completed |
Repair and Maintenance of Highway Structures - Contract 2
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The work has to be carried out at the existing services roads, flyovers and underpass of Khalifa Al Attiya – Al Asiri Interchange inside Doha. The Contract scope of work for this site is mainly repair of the road works, structural elements and storm water drainage system. The majority of works in this Contract are related with road works which require specialization in road works with the assistance of either In-house or Sub-contractors to deal with the other works such as structural and storm water drainage works. | 16,789,261.00 | 09-Mar-2015 | Completed |
Qatar Economic Zones QEZ-1 & QEZ-3 Asphalt Road Subcontract Works Package U2782781QEZ-LOA-0225 Rev. 0
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Urbacon Trading and Contracting | Complete Supply and Apply of Asphalt Works | 47,078.24 | 27-Jan-2015 | Completed |
Lusail Development - CP4 Road A1, Road A6, Marina & Southern Interchanges
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Midmac – Yuksel JV | Road Works | 32,344,701.46 | 07-Jan-2015 | Completed |
Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar - Contract 6
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The Works generally comprise of reconstruction, rehabilitation and maintenance of roads involving the General Traffic Works for Internal and External Works to ensure the safe movement of both vehicular and pedestrian traffic on all roads throughout the State of Qatar. | 38,994,747.00 | 31-Dec-2014 | Completed |
Doha Expressway Package 12: F-Ring Road
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Consolidated Contractors Group (CCC) & Teyseer Contracting Company – JV | Road Marking Works | 794,009.25 | 02-Dec-2014 | Completed |
North Farm (Umm Al Hawaya Farm)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Urbacon Trading and Contracting | Road Works including Base Course, Sub-base and Wearing Course | 4,905,213.00 | 01-Dec-2014 | Completed |
RIW in Various Areas of Greater Doha Phase -2
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Solid General Construction | Supply and Installation of Asphalt Material and Supply & Apply of Prime and Tack Coat | 15,563,405.00 | 30-Nov-2014 | Completed |
Road Improvement Works in Al Rayyan Area (Zone 51 to 55, 80 and 81) - Phase 3, Site nstruction No. 3: Wedding Hall in Al Jahihaniya
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Bandary – Konstruktor Infrastructure | Asphalt Works, Street Lighting, Traffic Signs, Qtel Works, Electricity Works, Drainage Works | 13,000,000.00 | 30-Nov-2014 | Completed |
Al Jawhara City
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Road Works | 3,323,081.00 | 30-Nov-2014 | Completed |
Construction of New Central Maintenance Store Buildings at Qatar University
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tadmur Contracting W.L.L. | Supply and Application of Asphalt Works, Road Markings and Traffic Signs | 4,550,000.00 | 19-Nov-2014 | Completed |
Al Khor Housing Project - Package 7A (Zone 13)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Domopan Qatar W.L.L. | Supply, Install, Complete and Maintain Road and Hard Landscaping Works | 2,000,000.00 | 30-Sep-2014 | Completed |
Sheraton Doha Renovation Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Road Works and Milling Works | 1,181,250.00 | 30-Sep-2014 | Completed |
Road Improvement Works in Al Rayyan Area (Zone 51 to 55, 80 and 81) - Phase 3 and Al Kheesa
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Bandary – Konstruktor Infrastructure | Asphalt Works, Traffic Signs and Road Markings | 6,950,225.00 | 30-Sep-2014 | Completed |
Provision of Road Marking Qatar, Contract 2
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Design, Supply and Installation of Road Markers and Road Studs | 3,047,125.00 | 17-Sep-2014 | Completed |
Construction of Multipurpose Hall at Al Sadd Sports Club Package 2 - Main Works
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Aktor Qatar | Road Works and Road Marking Works | 1,901,847.00 | 14-Sep-2014 | Completed |
Construction of 3 Schools (Al Rayyan Anad Aba Al Hayran 1 & 2) Package 4
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tadmur Contracting W.L.L. | Asphalt Works | 2,248,846.00 | 11-Aug-2014 | Completed |
Provision of Road Marking Qatar, Contract 1
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Design, Supply and Installation of Road Markers and Road Studs | 2,943,280.00 | 24-Jul-2014 | Completed |
Multipurpose Sports Hall and Administration Offices ( Qatar Handball Association Complex) Duhail
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Redco Construction – Almana | Asphalt Works | 866,875.00 | 07-Jul-2014 | Completed |
Construction of 3 Schools - Package 4
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading & Contracting | Supply and Application of Asphalt Works | 2,539,460.00 | 15-Jun-2014 | Completed |
Proposed Development of Barzan Camp Phase 2 - Package 1 - Barzan Barracks
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Redco Construction – Almana | Road Works | 647,000.00 | 14-Jun-2014 | Completed |
Construction of 3 Schools - Group 7A, Package 3 (Al Waab, Umm Mabaad, Umm Ghawailina)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tadmur Contracting W.L.L. | External and Sports Court Asphalt Works | 1,859,370.00 | 04-Jun-2014 | Completed |
Construction of Temporary Parking at Al Sadd C-Ring
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
ALYSJ (Joint Venture) | Sub-base, Wearing Course and Road Marking Works | 283,640.02 | 24-May-2014 | Completed |
Road Improvement Works Out of Greater Doha Access Road to Farms and Villages (Phase 2)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The project works located outside of greater Doha in various Zones (Zones 70-79, 80-86 and 91-98) and Municipalities to provide access roads to farms, Villages. The Works comprise the construction of temporary/permanent roads including provisionof utility services for future use. | 37,446,400.00 | 30-Apr-2014 | Completed |
Roads Reinstatement Works Related to Refurbishing and Upgrading Works for Pumping Stations PS-1, PS-5, PS-6, & PS-Mannai Underpass
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Road Reinstatement Works | 3,054,410.00 | 29-Apr-2014 | Completed |
New Doha International Airport Aircraft Maintenance Hangar Project CP-99 Airline Operations Facility Doha-State of Qatar
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Consolidated Contractors Group (CCC) & Teyseer Contracting Company – JV | Road Marking Works | 115,651.00 | 27-Apr-2014 | Completed |
Lusail Deveopment Primary Infrastructure CP5B Roads A1, A2, D2 and D3 North Inclusing Utility Tunnels and Connections
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Samsung C&T Corporation | Complete Supply and Installation of Asphalt Paving and Road Works | 93,349,784.50 | 02-Apr-2014 | Completed |
Epic of Phase 1 of New NGL Support Campus at Mesaieed, GC1010800
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Diplomat (GBH) – NCCIL JV | Asphalt Road Works | 16,882,864.61 | 17-Jan-2014 | Completed |
Road Improvement Works in Rayyan Area Site Instruction 1: Development of Shooting Range in Al Hussainiya
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Bandary – Konstruktor Infrastructure | Asphalt Works, Street Lighting, Traffic Signs, Qtel Works, Electricity Works, Drainage Works | 14,000,000.00 | 12-Jan-2014 | Completed |
Development of Barzan Camp - Phase 2, Package 5
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Petroserv LTD & FCC Construccion S.A – JV | Asphalt Wearing Course including Tack Coat, Base Course, Prime Coat over Sub-grade/ Granular Base (Class B) | 18,405,000.00 | 12-Oct-2013 | Completed |
Breeding Farm, Phase 1 of 2 at Al Zobara, Qatar
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Redco Construction – Almana | Supply, Delivery and Installation of Road Works Inclusing Road Marking and Cat Eyes | 14,295,037.03 | 31-Jul-2013 | Completed |
Doha Festival City 2100 - Ikea Box
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Arabian Construction Company | Road Works and Road Marking Works | 1,452,771.08 | 31-Jul-2013 | Completed |
Hyosong Substation (Ph-X) Project at Abu Hamour & NDBS
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Simplex Infrastructure Limited | Work Order for Asphalt Road Works | 538,350.00 | 30-Jun-2013 | Completed |
Development of Works in Bani Hajer, Zone 51
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Burhan – ITC JV | Road Marking Works | 1,080,667.00 | 20-Jun-2013 | Completed |
Epic for Southern Perimeter Industrial Fence, Security Patrol Access and Other Roads in ras Laffan City
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphalt and Road Marking Works | 15,419,244.47 | 23-May-2013 | Completed |
Epic for Earth Work, Filling, Road Network and Insfrastructure for (GSSA) and (LIA) Project in Mesaieed C013
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber & Partners | Road Marking Pavement Works | 134,334.00 | 21-May-2013 | Completed |
Road Improvement for Junctions & Roundabout in Various Areas of Greater Doha
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The project works located in various part of Doha areas within the boundary of Qatar Zones 1 to 68 of Doha Municipality. The works comprise of conversion of various existing roundabouts/junctions into signalized junctions. The works include the construction of permanent roads, street lighting, surface water drainage, footways, traffic signs and road marking, protection and diversion of existing utilities. | 90,130,596.85 | 12-May-2013 | Completed |
West Side Car Park - Diversion of Access Road to Dukhan Highway - Option 4
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Man Enterprises | Asphalt Works and Road Markings | 1,345,000.00 | 28-Feb-2013 | Completed |
Epic for Automation Upgrade at Jaleha (Dukhan) For Qatar Petroleum
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tadmur Contracting W.L.L. | Asphalt Works (Road Works) | 856,893.20 | 03-Feb-2013 | Completed |
Construction of North Site Infrastructure Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Man Enterprises | Asphalt Pavement and Sub-base Works | 15,592,428.50 | 31-Dec-2012 | Completed |
Areva Sub-station (Phase 8) Project at Saliyah Super
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Simplex Infrastructure Limited | Asphalt Road Works | 733,332.00 | 20-Sep-2012 | Completed |
Epic for Wet Utilities Distribution Network for Support Services Area Phase 1 & 2 and Main Network for Ongoing Development at West End Extension, Ras Laffan
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Road Works | 1,937,659.08 | 12-Sep-2012 | Completed |
Toyota Car Park at Barkath Al Awwamir
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Project & Plants | Road Works | 5,135,605.00 | 06-Jun-2012 | Completed |
Lekhwiya Sports Zone, Duhail Qatar
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Khayyat Contracting & Development | Supply of Materials, Construction, Preliminary Hand-over and Remedying of Defects Necessary for Road Works, External Sewerage Network, Surface Drainage Works, Roads and Paving of Stadium | 4,144,440.00 | 06-Jun-2012 | Completed |
Road Improvement Works in South Greater Doha Zone 90 to 95
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Site Clearance, Service and Drainage Ducts, Road Works, Sub-base and Road Base, Flexible Surfacing, Kerbs and Footways, Traffic Signs and Road Markings, Electricity Works, Street Lighting and Traffic Signal Works | 34,983,570.00 | 13-May-2012 | Completed |
Reconstruction , Rehabilitation and Maintenance of Roads Throughout Qatar - ERM1030, Contract 3
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | The works generally comprises of reconstruction, rehabilitation and maintenance of roads involving the General Traffic Works for Internal and External Works to ensure the safe movement of both vehicular and pedestrian traffic on all roads throughout the State of Qatar. | 36,689,761.12 | 03-Apr-2012 | Completed |
Barwa Commercial Avenue landscaping and Infrastructure - Roads and Front Road Access Points P10
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading & Contracting | Supply and Application of Asphalt, Traffic Signs and Road Markings | 16,988,500.00 | 15-Dec-2011 | Completed |
Provision of Road Markers in Inner & Outer Doha
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Road Marking Works | 2,392,150.00 | 08-Dec-2011 | Completed |
Construction of Infrastructure Priority Package for Qatar Foundation at Education City
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Man Enterprises | Asphlat Pavement and Sub-base Works | 6,080,835.00 | 01-Dec-2011 | Completed |
Reconstruction of Road Infrastructure in Mesaieed Community Area
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Road Works and Road Marking Works | 80,827,434.10 | 30-Nov-2011 | Completed |
ERC 1400/D3/C4, West Bay Project - Road Works & Infrastructure Zone 66 - New Diplomatic Area
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphalt and Road Marking Works | 13,113,730.78 | 30-Sep-2011 | Completed |
External Works for the Construction of New Reasearch Complex at Qatar University
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tadmur Contracting W.L.L. | Road and Asphalt Works | 8,652,000.00 | 11-Sep-2011 | Completed |
New Doha International Airport (NDIA) - Bike Path, Bus Shelter, Corniche Landscaping and Parking for Shade Structure Package CP66
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading & Contracting | Supply and Laying of Sub-base and Asphalt Imrinting of an Anti-Skid Color Coating | 12,000,000.00 | 31-Jul-2011 | Completed |
Parking and Warehouse Tents at Qatalum
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Manco International | Asphlat Works | 1,491,000.00 | 20-May-2011 | Completed |
Road Improvement Works in Zone (90 & 91) - Al Wakrah
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Site Clearance, Service and Drainage Ducts, Road Works, Sub-base and Road Base, Flexible Surfacing, Kerbs and Footways, Traffic Signs and Road Markings, Electricity Works, Street Lighting and Traffic Signal Works | 12,303,710.00 | 12-Sep-2010 | Completed |
Road Improvement Works in Central Rayyan - Phase 2
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Site Clearance, Service and Drainage Ducts, Road Works, Sub-base and Road Base, Flexible Surfacing, Kerbs and Footways, Traffic Signs and Road Markings, Electricity Works, Street Lighting and Traffic Signal Works | 35,799,176.50 | 01-Aug-2010 | Completed |
RAF A1 New Water Plant Onshore Civi Works Execution
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphalt Road Works | 2,037,425.00 | 29-May-2010 | Completed |
ERC1400/D20/C2 Industrial Interchange Doha Expressway - Package 3
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Konstruktor Engineering | sub-base and Asphalt Works | 82,849,592.00 | 10-Apr-2010 | Completed |
NCC Car Park Qatar Foundation, Education City
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Man Enterprises | Asphalt Road Works | 70,510.00 | 11-Oct-2009 | Completed |
Pearl - Road Works in Parcels (PA 11 to PA 18 - C)
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
CAT International | Asphalt Works | 2,108,396.82 | 31-May-2009 | Completed |
Improvement to Roads and Car Parks at Hamad General Hospital
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Tracer Qatar | Asphalt Works | 4,906,800.00 | 15-Mar-2009 | Completed |
The Pearl Qatar CP3-3: Porto Arabia Buildings PA-04
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
C.A.T. – Man JV | Road Marking Works | 2,791,525.00 | 15-Feb-2009 | Completed |
Qatalum Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphalt Works | 2,006,160.00 | 06-Feb-2009 | Completed |
Salwa International Highway Project, Interchange and Installation of Water Works
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Asphalt Works | 82,000,000.00 | 31-Dec-2008 | Completed |
Supply of Asphalt to Salwa Road Project
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Public Works Authority | Supply of Asphlat Materials | 37,632,000.00 | 30-Sep-2008 | Completed |
AKG2-Al Khaleej Gas Phase 2 Project, Civil Infrastructure and MEP Works for Accommodation Camps
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Engineering | Road Works | 2,066,256.00 | 30-Sep-2008 | Completed |
Mesaieed Housing Project: EP2002 / D01- Package 02
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading & Contracting | Asphalt Works | 4,898,000.00 | 30-Dec-2007 | Completed |
Mowasalat Staff Accommodation Package 1 - Parking Facilities at South Abu Hamour
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading & Contracting | Asphalt Works | 11,799,120.00 | 25-Jun-2007 | Completed |
Ramada Hotel Extension - Reinstatement of Car Parking Area
Client | Project Description | Project Value (QAR) | Completion Date | Status |
---|---|---|---|---|
Al Jaber Trading & Contracting | Asphalt Works | 1,354,470.00 | 15-Apr-2007 | Completed |